A practical application of continous optimisation of a district heating and cooling plant in Japan

The importance of plant commissioning, or Testing, Adjusting and Balancing, is well known to Japanese engineers, but there are as yet few examples of their application, especially of continuous optimisation as an ongoing extension of commissioning. Against this background, this article presents an analysis of ten years’ operational results of a district heating and cooling (DHC) plant. The plant is one of the most efficient DHC plants in the country, with the largest thermal energy storage capacity in the country (a total water volume of 19 060 m3). The plant has been in operation since March, 2001. With over ten year’s operational data therefore available, it is possible to see the results of continuous optimisation and of the use of high-capacity thermal energy storage.

Download

Publication type Magazine/Newsletter article

Publication date 31 January 2013

Authors Momota, M., Ibamoto, T., Inoue, T., Yanagihara, R., Okagaki, A