Completed Annexes

HPT TCP has been active since 1978, with a lot of collaborative research, development, demonstration and deployment projects. We call these projects "Annexes" and they are conducted on a combination of cost sharing and task-sharing basis by the participating countries. Here you can read about the finalized projects, from 1989 to this present date.


Annex

56

Start date:
End date:

Internet of Things for Heat Pumps

The Annex description: The IoT Annex focusses on the opportunities and challenges of IoT enabled heat pumps. Connected devices will play a major role in the future addres…

Annex

55

Start date:
End date:

Comfort and Climate Box

– Speeding up market development for integrating heat pumps and storage packages   Annex 55 aims to accelerate market development of Climate and Comfort box soluti…

Annex

53

Start date:
End date:

Advanced Cooling/Refrigeration Technologies Development

Growing populations and improving economies world-wide, especially in the developing world, are projected to lead to huge increases in global demand for space cooling, de…

Annex

52

Start date:
End date:

Long term performance measurement of GSHP Systems serving commercial, institutional and multi-family buildings

Measured long-term performance data for ground source heat pump systems serving commercial, institutional and multi-family buildings are rarely reported in the literature…

Annex

51

Start date:
End date:

Acoustic Signature of Heat Pumps

Reduction of acoustic emissions is important to further increase the acceptance of heat pumps as air-to-water, water-to-air, air-to-air and brine-to-water (ground source)…

Annex

50

Start date:
End date:

Heat Pumps in Multi-Family Buildings for space heating and DHW

The overall aim of this Annex is to increase the use of heat pumps in multi-family buildings. The main objectives is therefore to demonstrate possible energy savings and …

Annex

49

Start date:
End date:

Design and integration of heat pumps for nZEB

The dominating concept to reach the zero energy balance over an annual period for a nearly Zero Energy Building (nZEB) is the combination of a solar PV system and a heat …

Annex

48

Start date:
End date:

Industrial Heat Pumps, Second Phase

The official end date of Annex 48 is 31/03/2019. Compilation of the final report is ongoing.   Industrial heat pumps (IHP) are active heat-recovery devices that incr…

Annex

47

Start date:
End date:

Heat Pumps in District Heating and Cooling systems

Objective The official end date of Annex 47 is 31/12/2018. Compilation of the final report is ongoing.   The objective of this annex is to gather information and ide…

Annex

46

Start date:
End date:

Domestic Hot Water Heat Pumps

Objective The objective of the Annex is to analyse the information on hot water heat pumping technologies for the production of sanitary hot water in domestic and other a…

1 2 3 4